Load Way: | Electronic Load |
---|---|
Loading Method: | Dynamic Load |
Display: | Digital |
Control: | Computer Control |
Power Source: | AC380V |
Transport Package: | Wooden Box |
Customization: |
---|
Suppliers with verified business licenses
Once completed the road material - soil, stable soil two ash crushed stone molding, off
A surname; Used in conjunction with Marshall compactor to complete the demoulding of asphalt mixture after compacting.
Meet the requirements of the Ministry of Communications JTG E40-2007 "Highway Geotechnical test Regulations".
1. Factory direct sales.
2. Two-year warranty.
3. Good after-sales team -24 hours.
Q: Are you a trading company or a factory?
A: Factory + trade (integration), more than 20 years of focus on roads, construction, materials, test equipment fields
Q: After the order is placed, when will it be delivered?
A: Usually around 10-25 days. If we have it in stock, we can arrange delivery within 3 days.
Please note that our production lead time depends on the specific item and the quantity of the item.
Suppliers with verified business licenses